

New aluminium bolster beam extends along the entire length of the ridge and acts as one with the existing ridge to virtually eliminate the need for tie bars

New cast aluminium "end stop" on the eaves beam featuring integral slots for an anchor bolt to hold the conservatory to the host wall even more securely.

New reinforcement in the starter bar to ensure that three anchor bolts are drilled into the host wall where the eaves beam is most vulnerable to pulling away

New "Ridge Compression Plate" that sits at the end of the aluminium ridge body where it joins the house wall - this distributes compression forces across the host wall and allows installers to assemble and suspend the starter bars, prior to attaching the main ridge body

An additional cleat in the eaves beam, on 90-degree corners. This is backed up by two additional retention bolts where the hip bar sits on to the slotted ridge end